We were awarded this project from Chichester Festival Theatre to replacement the waterproofing membrane and improve the thermal performance of the restaurant roof area on the Minerva Theatre in 2023.
We had to remove 300m2 of the existing felt covering and 150m2 of wet damaged insulation, this was replaced with 130mm thick Kingspan rigid insulation board a metal lined vapour barrier and covered over with a two layer torch on felt system with an mineral surface finish to protect from harmful UV light.
The customer gave us a short window to carry out this work when the theatre shuts down before the new season of performances restarts, and our team comprising of brother`s Ryan and Stuart and trainee Sandea completed the works in good time. The theatre management were extremely pleased with the finished job and the way in which our team worked in a professional and courteous manner whilst on site.